The Works includes design, prototyping, manufacture, supply, delivery, installation, testing and commissioning of approximately 1,580 Platform CSC Processors, system integration, testing and commissioning of the overall AFC system including the Corporation’s existing AFC backend system, decommissioning, dismantling, removal and/or disposal of existing equipment. The existing power cables and data network cables for the AFC equipment for 157 platforms at 69 LRL stops shall be replaced.